Prosody Consulting logo
A Prosody Consulting Research Product  ·  prosodyconsulting.comGet email updates
Back to Prosody Labs

PIDP Award Analytics — FY2019 → FY2026

Port Infrastructure Development Program • U.S. Maritime Administration (MARAD) • Every round analyzed on a common template, with program-to-date roll-ups • FY2026 awards announced Oct 27, 2026
Awarded
$497.9M
▼ 35.7% vs prev
Awards
35
▼ 5.4% vs prev
Applications
174
▼ 6.5% vs prev
Success Rate
20.1%
prev 19.9%
Oversubscription
5.50×
req ÷ awarded

Program Trend — FY2019 to FY2026

Full program history. The selected year is highlighted. Toggle the metric.
Awarded $
Applications
Awards
Requested $
Success Rate
Oversubscription

Cumulative Roll-Up — Program to Date

Running totals through each fiscal year (the roll-up of all prior rounds). Bars = annual; line = cumulative.
Awarded $
Awards
Applications

Awards by State — FY26 SINGLE YEAR

Toggle metric. Top 15 states shown.
Awarded $
Applications
Awards
Capture Rate

Project Category

Construction / Planning / Both (by $ awarded).

Special Categories

Inland, Energy, Rail, Tribal & more.

Leverage → Win Rate

Non-federal cost share band vs success rate.

Award Detail — FY26 SINGLE YEAR

35 awardsTotal: $497.9M
YrStateApplicantProjectCategoryProject CostRequestAwardLeverageTags
FY26AKCity of WhittierDeLong Dock Replacement ProjectConstruction$52.1M$50.6M$50.6M3%
FY26HIHawaii Department of Transportation, Harbors DivisionPort of Kahului Cargo Yard ExpansionConstruction$56.2M$40.1M$40.1M29%
FY26KYPaducah-McCracken County Riverport AuthorityPaducah Riverport-West Full BuildoutConstruction$78.4M$40.0M$40.0M49%Inland Rail
FY26FLJacksonville Port AuthorityBlount Island Marine Terminal Berth Modernization - Phase IConstruction$73.0M$40.0M$40.0M45%
FY26FLBroward CountySlip 1 Energy Security & Expansion ProjectConstruction$192.9M$30.8M$30.8M84%Energy
FY26WICity of MilwaukeeLake Michigan Marine Highway Transportation EnergyConstruction$45.4M$30.4M$30.4M33%Inland Energy
FY26AKCity of KodiakSaint Herman Harbor Recapitalization Project: Phase 2AConstruction$33.0M$26.1M$26.1M21%
FY26WAPort of VancouverPort of Vancouver Berth 8 Improvements for Cargo Handling ProjectConstruction$30.1M$18.0M$18.0M40%
FY26WANorthwest Seaport AllianceWashington United Terminals Infrastructure ReliabilityConstruction$22.8M$11.4M$11.4M50%Rail
FY26AKCity of NomeArctic Deep-Draft Port – Local Service FacilitiesConstruction$14.8M$11.3M$11.3M24%
FY26CAPort of RichmondRehabilitation of Essential Structural Throughput, Operations, and Reliability (RESTORE) Berth 8 ProjectConstruction$14.6M$11.3M$11.3M23%
FY26PAThe Redevelopment Authority of the County of DelawarePenn Terminals Cargo Handling UpgradesConstruction$32.2M$11.3M$11.3M65%
FY26ILIllinois Waterway Ports CommissionPeoria Multimodal River Terminal ProjectConstruction$18.8M$11.3M$11.3M40%Inland
FY26NCNorth Carolina State Ports AuthorityRehabilitation of Morehead City's Berth 4Construction$20.6M$11.3M$11.3M45%Rail
FY26ALCounty of WashingtonHooks Lake Port Improvements to Accelerate Production and Distribution of American SteelConstruction$18.0M$11.2M$11.2M38%
FY26INPorts of Indiana - Burns HarborBurns Harbor Container Handling Modernization ProjectConstruction$14.0M$11.2M$11.2M20%Inland
FY26OKMuskogee City - County Port AuthorityPort Muskogee Barge Safety & Efficiency Improvement ProjectConstruction$13.8M$11.1M$11.1M20%Inland
FY26FLOcean Highway and Port AuthorityPort of Fernandina: Restoring, Revolutionizing, and Modernizing Port InfrastructureConstruction$11.3M$11.0M$11.0M2%
FY26WAQuinault Indian NationWestport Tribal Port Cold-Chain Freight FacilityConstruction$14.8M$11.0M$11.0M26%Tribal
FY26ILGrundy County, IllinoisGrundy County Multimodal Terminal Expansion ProjectConstruction$13.7M$11.0M$11.0M20%Inland
FY26MNCity of Red WingRed Wing Agricultural Expansion and Port Infrastructure Economic Advancement ProjectConstruction$15.5M$10.2M$10.2M35%Inland
FY26TXPort FreeportInner Harbor Berth 3 ModernizationConstruction$12.6M$9.4M$9.4M25%
FY26ILCity of Rock IslandPort of Rock Island Expansion and Rehabilitation ProjectConstruction$13.9M$9.0M$9.0M35%Inland Rail
FY26TXPort of Corpus Christi AuthorityDigital Infrastructure, Integration, and Innovation (DI3)Construction$10.0M$7.2M$7.2M28%
FY26ILAmerica's Central Port DistrictGranite City Rail Reconstruction ProjectConstruction$9.0M$6.8M$6.8M25%Inland Rail
FY26DEDiamond State Port CorporationPort Wilmington Auto Logistics Infrastructure Improvement ProjectConstruction$11.2M$6.7M$6.7M40%
FY26AKMunicipality of Anchorage - Don Young Port of AlaskaPAMP Stevedore Support Facilities & Landside Operations Readiness ProjectConstruction$10.7M$6.4M$6.4M40%
FY26AKCity of KakeKake Marine Cargo Dock Development ProjectConstruction$6.3M$6.3M$6.3M0%
FY26WAPort of Grays HarborWestport Marina Float 15 ReplacementConstruction$9.3M$6.3M$6.3M32%
FY26MSHancock County Port and Harbor CommissionIntermodal Facility on Site 4Construction$7.5M$6.0M$6.0M20%
FY26AKOunalashka CorporationOunalashka Arctic and North Pacific Maritime HubPlanning$4.4M$4.4M$4.4M0%Tribal
FY26LAAvoyelles Parish Port CommissionMultimodal Truck to Barge Grain Transfer Facility ProjectConstruction$5.0M$4.0M$4.0M20%Inland
FY26WAJamestown S'Klallam TribeJamestown S'Klallam Tribal Port ProjectPlanning$4.8M$3.8M$3.8M21%Tribal
FY26METown of RockportResilient Seafood Harbor Infrastructure & Microgrid ProjectBoth$4.8M$699K$699K85%Energy
FY26ILIllinois International Port DistrictLake Calumet Terminal Modernization Planning StudyPlanning$800K$600K$600K25%Inland

Frequently asked questions

What is the Port Infrastructure Development Program (PIDP)?
PIDP is the U.S. Maritime Administration (MARAD) grant program that funds coastal, inland, and Great Lakes port infrastructure to improve capacity, efficiency, resilience, and the movement of freight through American ports.
What does the PIDP Award Analytics dashboard show?
It analyzes eight years (FY2019–FY2026) of MARAD PIDP awards — funding trends over time, applicant success rates, state-by-state breakdowns, project categories, and a leverage-to-win analysis of how cost-share ratios relate to award outcomes.
What is leverage-to-win analysis?
It examines the relationship between the non-federal cost share an applicant commits (its leverage) and the likelihood of winning a PIDP award, helping port sponsors benchmark competitive match levels.
Where does the PIDP data come from?
From MARAD's published PIDP award announcements for fiscal years 2019 through 2026 (plus MARAD's eligible-applicant list), compiled and normalized by Prosody Labs.